No text logo
  • About us
  • Events
  • Products
  • Contact Us
  • Photos
  • Virtual Tour
    • Virtual Tour (2:35)
    • Virtual Tour (15:04)

The Founding Family

Progress

East facing view of south vineyard while it was still pasture and timber.
View of timber and edge of junk yard before all cleared up for vineyard.
Side view of timber and ditches that will be transformed for vineyard.
View of junk yard in front of timber with excavator to the right.
View of thick timber and iron pile before being cleaned up for vineyard and ponds.
View of timber and iron pile before it was transformed.
Large iron pile with timber and ditch in background.
View of timber and junk yard with excavator in middle.
Excavator at far end of cleared section.
Far view from southeast corner looking toward remaining timber.
Very distant view showing all the trees and the barely visible old junk yard before being cleaned up for vineyard.
Side view of timber and iron pile before they were cleared to make the west pond. Welded tube in the foreground ready to be placed once dam is built.
Excavator and bulldozer clearing trees for the vineyard.
North vineyard ground cleared and prepped with trellis end posts being put in.
Young vines in distance with excavator parked near drain pipe for the upper pond.
Upper pond being built, edges being dredged with excavator sitting to the side.
Upper pond nearly complete. Banks smoothed out and dam is built, ready for water.
First ditch, which will be the future west pond, being cleared out.
West pond dam nearly complete.
View of ditch running through timber before being cleaned out.
Close up of upper pond, completed but waiting for spring rains.
East pond being built. Grapes in far distance past the pond.
Bulldozer clearing out ditch to build the East pond.
East pond dam being built.
Metal drain pipe being placed for east pond.
East pond being dredged before it fills.
Dredging east pond before it fills.
Beginning of ditch being cleared to make ponds. Valley running through timber.
Tree's piled up while others left standing in prep work for vineyard.
Small old pond that was near current bandstand before being filled and turned into another pod of grapevines.
Distant view of section of timber that will be cleared and cleaned up for vineyard.
Excavator sitting on edge of ditch, ready to start clearing for a pond.
Bobcat auguring hole for a vine to be planted.
End posts just placed for the initial rows.
Rebar bent into a "U" shape to hold the grow tube up for the plant to grow inside.
Fall view of newly finished trellis system on south side.
Looking down very long row of vines hiding inside grow tubes.
Grow tubes with some hedge posts in for the beginning of trellis system.
Grow tubes on bare dirt with the start of trellis system going in.
Very early planing stage, putting grow tubes over new plants.
Very initial stage of grow tubes completely covering baby vines with nearly finished pond in background.
Side view of first section of vineyard all grow tubes on.
Side view of grapes in grow tubes with one pond in background.
Full southern vineyard view of vines pushing out the top of grow tubes.
Grow tubes with vines reaching out the top.
Rows of baby grapevines reaching out from the tops of their grow tubes to reach the trellis wire.
View down a row of vines peeking out of grow tubes.
Rows of young grapevines stretching out on a cloudy day.
Distant view of first section of young grapevines.
Distant view over very young grapevines starting to spread their vines out both directions.
Distant north view of southern grapes.
Close up view of young high wire vine.
Close up view of grapes sprawling down row with a lot of baby clusters forming.
Close view of red grapes on harvest day.
Rows of young grapevines stretching ahead on a dreary day.
Rows of grapevines on a sunny day.
Beginning of winery. Rebar being tied up for walls of winery.
Winery walls poured and concrete forms coming off.
Winery walls poured and top view getting prepared for roof pour.
Framing for the tasting room in progress.
Full view of tasting room construction. Framing nearly complete for the walls and roof.
Pouring the raised cement balcony in front of the framed and roofed tasting room.
Unfinished exterior of tasting room. Roof completed but no stain on panels yet.
Tasting room ceiling shiplap boards being installed.
Tasting room cabinets beginning to be built from native walnut from the property.
Tasing room interior vaulted ceiling trim being put up.
First layer of the two tier solid walnut bar laid out to prep for install.
Tasting room heavy walnut bar with epoxy coat finished and glistening in the sun.
Finished tasting room interior in the evening with the lights casting a warm glow.
  • Follow

Contact us

30484 Icon Road
Maryville, MO 64468

660-582-4474

Tasting room hours

Friday 5:00pm – 9:00pm

Saturday 3:00pm – 8:00pm

Gift cards available in tasting room

Purchase eGift cards here!

 Accepting Visa, Mastercard, Discover, American Express

Contact us by email

6 + 15 =